Central Pennsylvania Hospital

Boiler Plant for 260-Bed Hospital

Project Quick Facts

Services Provided: Architecture and MEP Engineering

Size: 5,670 SF

Completion Date: April 2017

The new 1800 BHP steam plant will replace the building’s original equipment and has the capacity for a future 600 BHP unit.  Housed in a new addition to the existing plant, the design applies some of the industry’s most efficient technologies to optimize plant capacity and reduce the payback period of the new equipment.  The plant is capable of feeding through backpressure turbine for combined heat and power generation.  2N redundant power supplies and steam headers insure continual operation of the plant.